2002. Travel to Cape Verde. D44TT
Moscow-Lisbon flight. 4L5A and EY8CQ.
Lisbon. EY8MM
Xara D44TD
Sal Island.
Sal Island.
EY8CQ and 4L5A in Mindelo.
Meeting with GB-antennas installation team.
Building quads.
New house is not ready yet.
EY8CQ
Monte Verde.
D4B/D44TT QTH
Work in progress.
Antenna team with D44AC and EY8CQ
Wind make installation realy hard.
Testing first antenna.
Installing second antenna.
EY8MM
Sold motors was too weak. Crain lifting antenna up to 24 m level.
Sold motors were too weak. Crain lifting antenna up to 24 m level.
Installation.
Spectators.
EY8CQ.
Overview to island from Monte Verde.
Installing third antenna.
EY8CQ.
9 meter high crain plus 400 m mountain....
EY8CQ
EY8CQ and EY8MM just connected last element to third antenna.
D4B/D44TT QTH
Tiny flower.
Alex EY8CQ talking to his XYL EY8AW and son EY8DQ.
EY8CQ and D44AC.
See how strong the wind is.
Installing 80 m verticals.
Installing 80 m verticals. EY8CQ explaining what needs to be done on body language.
D44AC and D44CA
CQ WW SSB 2002.
Water start leaking from inside of newly installed cables.
EY8MM and results of 25 days work on background.
D44CA, EY8MM, D44AC, EY8CQ.
EY8CQ connecting elevated radials to 80 m vertical.
D4B/D44TT QTH
Something to remember.
Al 4L5A, Silvio IV3TRK, Alberto IV3TAN, Nodir EY8MM before departure from Sal island.
DatsoGallery By Andrey Datso
JoomlaWatch 1.2.12 - Joomla Monitor and Live Stats by Matej Koval
 
 
©2014 EY8MM, Nodir Tursoon-Zadeh